KUALA LUMPUR (March 18): With the spike in COVID-19 cases over the past few days plus two deaths, it was only inevitable a “lockdown” of sorts would be implemented all over the country.

We have decided to term it as movement control order.

And how has Kuala Lumpur plus the Klang Valley handled it so far?

Here some pictures of the first day of the movement control order. You would think that it is the festive season and city folk have all balik kampong. Sadly, this is caused by a virus.

The movement control order ends after March 31.

SHARE
RELATED POSTS
  1. Kuala Lumpur luxury hotel transactions rise 14% as Asia Pacific deal volumes hit US$2.1 bil in 2025, says JLL
  2. LBS Bina posts RM37.7 mil 1Q PBT, rides on Klang Valley projects and stronger construction earnings
  3. Kuala Lumpur residential market hits five-year high in 4Q — JLL