KUALA LUMPUR (Dec 19): Bina Puri Holdings Bhd shares rose 1.45% this morning after the company through its wholly-owned subsidiary BP Energy Sdn Bhd bagged a project from Malaysia's Energy Commission to develop a 5MW solar photovoltaic plant in KunakSabah under the commission's large-scale solar plant initiative.

At 9.10am, Bina Puri added 0.5 sen to 35 sen with 151,000 shares traded.

The project is on a build-own-operate (BOO) basis, is located in Kampung Dasar in Kunak and all the documentation is expected to be finalised by March 2018.

Bina Puri group executive director Datuk Matthew Tee Kai Woon revealed its plans to add more solar farms and mini hydro powers into its power portfolio. — theedgemarkets.com

For more stories, download EdgeProp.my pullout here for free.

SHARE
RELATED POSTS
  1. Energy Commission to begin drafting rules for cross-border power trading in early 2026, says CEO
  2. Bina Puri hit with sixth winding-up petition of 2025, third filed by IRB
  3. Bina Puri seeks 10% debt waiver under conceptual restructuring plan