PETALING JAYA (May 28): Tun Dr Mahathir Mohamad has confirmed that the Kuala Lumpur-Singapore high speed-rail (HSR) will be cancelled, with the penalty likely to be around RM500 million, the prime minister told reporters today after a Parti Pribumi Bersatu Malaysia meeting.

“We need to do away with some of the unnecessary projects, for example the high-speed rail, which is going to cost us RM110 billion and will not earn us a single sen. That will be dropped.

“We have an agreement with Singapore. We have to talk with Singapore about dropping that project,” said the 92-year-old premier.

The 350km HSR will have a proposed seven stops — Bandar Malaysia, Bangi-Putrajaya, Seremban, Melaka, Muar, Batu Pahat, and Iskandar Puteri — in Malaysia, and Jurong East in Singapore.

SHARE
RELATED POSTS
  1. Singapore takes possession of Lee Kuan Yew's 38 Oxley Road home, public space options under study
  2. IOI Properties to seek shareholders' approval on Aug 27 for S$1.2b Singapore acquisition
  3. Sunway-led JV wins RM6.74 bil Bayshore Drive mixed-use site in Singapore